Cluster 5 – Climate, Energy, and Mobility: Cost-effective next-generation batteries for long-duration stationary storage (Batt4EU Partnership)
Horizon Europe
Program code: HORIZON-CL5-2025-01-Two-Stage-D2-02
Program Type: RIA
Research Area: Advanced battery materials aiming at storage duration from 10 hours to seasonal storage are developed. Minimised use of Critical Raw Materials (CRM) in line with the EU's Critical Raw Materials Act. Development of viable alternatives to the current state of the art for battery technologies and to other seasonal storage devices in terms of cost, efficiency, safety, lifetime and (environmental) sustainability. Improved longevity of energy storage systems. Battery technologies with minimal required auxiliary services, storage in a wide range of State-of-Charges (SOCs), and minimal voltage slippage.
Funding: EUR 15M, 3 grants (each EUR 5M)
MPO Deadline: Contact MPO as soon as possible in the project planning stage
Agency deadline: 02 Sep 2025 (First Stage), 31 Mar 2026 (Second Stage)
Deadlines
UM Internal Deadline | Sponsor Deadline | |
---|---|---|
Application | 13-Aug-2025 4:30 pm CST | 02-Sep-2025 |
Important
The information in this directory is provided as a service to the University Community and anyone with legitimate business with the University. Use of this directory to prepare mass mailings is prohibited.