Next generation distribution substation for increasing the system resilience
Horizon Europe
Program Code: HORIZON-CL5-2026-02-D3-18
Program Type: Innovation Action
Research Areas: Optimize management and resilience of electricity distribution grids and create a “smart substation ecosystem” that includes distribution system operators (DSOs), technology/solution providers, integrators, application developers, etc. Testing should be done in at least two EU Member State or Associated Countries and include at least five DSOs operating across different geographies, and at least two suppliers of technologies for smart power substations. Activities are expected to achieve TRL 7.
Total Funding Available: €18M for 2 projects
- MPO Deadline: Contact MPO as soon as possible in the project planning stage
Deadlines
UM Internal Deadline | Sponsor Deadline | |
---|---|---|
Application | 27-Jan-2026 4:30 pm CST | 17-Feb-2026 5:00 pm CET (Brussels) |
Important
The information in this directory is provided as a service to the University Community and anyone with legitimate business with the University. Use of this directory to prepare mass mailings is prohibited.